Samsonite

Jacksonville, FL

Replacement of approximately 185,000 square feet of concrete slab-on-grade inside an existing facility due to moisture related issues. 

The new slab-on-grade is poured on top of a gravel sub-base and vapor barrier.  Replacement of the floor slab necessitated the erection of a full height light gauge dust wall to prevent damage to existing inventory inside the warehouse.

Jacksonville Web Design, Graphic Design, and Brand Development