New 78 foot long two lane bridge connecting two residential subdivisions over an irrigation canal. The bridge structure consists of precast prestressed concrete double T beams manufactured in conformance with Florida Department of Transportation specifications. Parallel to the traffic lanes is a wide sidewalk and cast-in-place concrete sidewall with reveals. The bridge is supported at both ends by a cast-in-place concrete bent.