New 30,000 square foot, five-story, fixed base of operations (FBO) building with an 80 foot long enclosed, elevated pedestrian bridge connecting the new facility to an existing building on an adjacent property. The structures are steel framed with cast-in-place concrete floor slabs on steel form deck supported on open web steel joists and steel beams. Three steel pipe braced frames were used for lateral stability. Poor soil conditions required the entire project to be founded on concrete filled steel pipe piles.